Residential Subdivision
Previous Residential Subdivision Projects:
25 Byron Rd, Leppington NSW
$3.5 million
The 25 Byron Rd Estate is located in Leppington, 38 kilometres south-west of Sydney CBD, which is a highly growing suburb in Southern region.
This residential subdivision consists of 43 residential lots, as well as 1500 linear metres council road.
Works Involved
Residential Subdivision & Bulk Earthworks
Bulk earthworks, construction of retaining walls, onsite retention basin (OSD), water, electrical and sewer reticulation, telecommunication, stormwater drainage works, and kerb & gutter.
75 Windsor Rd, Baulkham Hills
$4.5 million
This residential subdivision consists of 2 stages. Stage 1 includes 24 residential lots and stage 2 includes 37 residential lots and 2 commercial lots. Besides, the construction of a slip lane on Windsor road under RMS specifications is also a part of the stage one.
Works Involved
Residential Subdivision & Landscaping
Water, sewer, electrical, gas & telecommunication services to each site and connecting them via road pavements, OSD tank, kerb & gutter, driveways, shared pavements and street landscaping.
149 Ingleburn Rd, Leppington
$2.4 million
This is a residential subdivision consisting of 46 residential lots, 2 Residual lots as well as council roads.
Works Involved
Residential Subdivision & Bulk Earthworks
Bulk earthwork with 25000 cubic metre of import fill, construction of OSD Basin with installation of GPT. 100 m long construction of blockwork retaining wall. Building of pavement layers, demolishing existing turning head, stormwater works and completed concrete works including construction of footpaths across all roads, council pits & structural pits. Carried out service reticulation works such as water, electrical, gas and telecommunication services.
90-100 Myrtle Creek Ave, Tahmoor
$4.1 million
Residential subdivision work with 58 lots.
Works Involved
Residential Subdivision & Demolitions
Clearing and Demolitions works, Sediment and Erosion Controls, Bulk Earthworks for 18,000 cubic meters, Stormwater Drainage works, formation of council reserve including roadworks, kerb and gutter, footpaths, etc., Concrete driveways, Water and Sewer Reticulation works, Utilities laying including electricity, gas and NBN, Onsite Stormwater Detention Tank, Landscape works for council.
143 Ingleburn Rd, Leppington
$2.3 million
Subdivision work with 18 residential lots and one residual lot.
Works Involved
Residential Subdivision & Bulk Earthworks
Bulk earthworks include fill of 6000 cubic meters with VENM material, construction of Onsite detention basin (OSD) including installation of GPT, roadworks include construction of all pavement layers with replacement of poor subgrade. Remediation of contaminated land, bulk earthwork, demolition of existing structures, tree removal, concrete retaining walls, sewer and water reticulation, electrical, gas and telecommunication services.
275 Sixth Ave, Austral
$1.5 million
Subdivision of existing allotment into 16 residential lots.
Works Involved
Residential Subdivision & Construction of Roads
Construction of roads, kerb & gutter, demolition of existing structures, headwall, removal of trees and site remediation, concrete sleeper retaining walls, utilities (electricity, gas, telecommunication, water and sewer), interallotment drainage, subgrade stabilization using quicklime, existing stormwater pipes investigation and repair by Structural patching; Design and documentation coordination (Superintendent).
What could delay a residential subdivision project in NSW?
Delays usually occur when there is a ppor stormwater design, unclear title boundaries and slow utility installation. CBEM Constructions will flag issues at early stage and provide suggestions as soon as possible to prevent delays and also have quick respond time for emergency issues.
How do you know that your residential subdivision is ready?
CBEM Constructions will hand over all the documents including sperate lot titles and design plans. We will conduct a lot orientation and show the infrastructure placement planning. We ensure that the seperated lots are ready to move on.
Expert of Residential Subdivision CBEM Constructions
Residential subdivision is the process of dividing a large block of land into smaller lots. Very often, this means that people sell their land to property developers. These developers then work out how many acres they want and start drawing lines on grids. The developers’ plan is to build different types of homes on each of the blocks that they create through the proces. Having the lots split into two completely separate areas by subdividing them can cause people to feel like the land use is less dense, giving them a better view.
Our comprehensive residential subdivision services include:
✅ Site clearing and preparation—Make sure the land is ready for building
✅ Road and drainage system construction—Meet all the requirements set by the council or regulatory authority
✅ Water, electricity, and telecommunications installation —Proving complete utility service hookups for the site
✅ Earthworks and land grading—Ensure that lots meet civil engineering requirements
✅ Project management and authority approval—Managing the coordination of activities to leverage resources efficiently and support a smooth project implementation with skillful construction
Why Choose Our Residential Subdivision Service?
Certain skills are needed to navigate residential subdivision in NSW. It requires expert knowledge of local planning laws, infrastructure requirements and council regulations. At CBEM Constructions, we have our experts that have years of experiences to help you handle all the requests. With all the services that we provide on the top, feel relax and let us be your strongest backup. Whether you are a property investor, developer or land owner, we will always provide solutions for your request. Choose us and you will never regret!
NEED HELP WITH YOUR PROJECTS?
INQUIRE NOW!