Residential Subdivision Construction in Sydney & NSW

CBEM delivers residential subdivision construction, including the roads, drainage and services that support new residential lots. Our work covers staged subdivisions and smaller developments in Sydney and regional NSW, with the civil package defined around the approved design.

Residential subdivision creates smaller residential lots from an existing parcel of land. Delivering the civil infrastructure is one part of that process: the planning, surveying, design and certification roles remain with the appointed professionals. CBEM coordinates the agreed construction package with the project team.

Residential Subdivision Civil Works

  • Bulk earthworks and lot formation
  • Stormwater drainage and on-site detention
  • Sewer, water and utility service coordination
  • Roadworks, kerb and gutter
  • Footpaths, crossings and retaining structures
  • Testing, as-built records and handover documentation

Staging and site access

We plan the works around construction access, adjoining properties and the release of each stage. Earthworks levels, service trenches, crossings and pavement construction are coordinated so that completed work is protected while the remaining stages proceed.

Connecting the services

We coordinate installation and inspection requirements with the design team and utility providers. Work on authority assets and connections to existing networks is carried out by the required authorised providers. The programme allows for those connections, inspections and associated clearances.

Preparing for handover

We check the completed civil works against the drawings and compile the required inspection, testing and as-built records. Where included in our contract, we support the documentation and authority close-out needed for subdivision certification and registration.

Residential subdivision project examples

View 105 Ninth Avenue in Austral, a 23-lot development with a bio-retention basin, and 149 Ingleburn Road in Leppington, comprising 46 residential lots and two residual lots.