OUR PROJECTS

CBEM are committed to delivering projects that lift the standard of delivery and add value to a competitive market.

25 Byron Rd, Leppington NSW

$3.5 million

The 25 Byron Rd Estate is located in Leppington, 38 kilometres south-west of Sydney CBD, which is a highly growing suburb in Southern region.

This residential subdivision consists of 43 residential lots, as well as 1500 linear metres council road.

Works Involved

Bulk earthworks, construction of retaining walls, onsite retention basin (OSD), water, electrical and sewer reticulation, telecommunication, stormwater drainage works, and kerb & gutter.

35 & 45 Byron Rd, Leppington NSW

$4.3 million

93 residential lots in residential development project.

Works Involved

Water, sewer, electrical, gas & telecommunication services to each site and connecting them via road pavements, kerb & gutter, driveways, shared pavements and street landscaping.

36 & 46 Rickard Rd, Leppington

$4 million

This development is part of Leppington Garden Estate Stage 2

Works Involved

36,000 cubic metres bulk earthwork, construction of onsite retention basin with landscaped sandstone retaining wall, massive twin 1350 diameter stormwater drainage system with structure pit up to 4.5m in depth, concrete retaining structures, council road pavement, and all relevant utilities (power, sewer & water, gas, NBN, and telecommunication).

105 Ninth Ave, Austral NSW

$1.5 million

Total 23 residential lots in a popular residential development project.

Works Involved

Bulk earthwork, concrete retaining structures, construction of flexible pavement (roadwork), stormwater drainage structure, bio-retention water quality control basin, & all relevant utilities.

75 Windsor Rd, Baulkham Hills

$4.5 million

This residential subdivision consists of 2 stages. Stage 1 includes 24 residential lots and stage 2 includes 37 residential lots and 2 commercial lots. Besides, the construction of a slip lane on Windsor road under RMS specifications is also a part of the stage one.

Works Involved

Water, sewer, electrical, gas & telecommunication services to each site and connecting them via road pavements, OSD tank, kerb & gutter, driveways, shared pavements and street landscaping.

Lot 400 Strathyre Dr, Prestons

$3.4 million

Total 47 residential lots in popular residential development project.

Works Involved

Construction of new road, stormwater, sewer and water reticulation, electrical, gas and telecommunication services, footpath and street parking bays, Public Domain work.

90-100 Myrtle Creek Ave, Tahmoor

$4.1 million

Residential subdivision work with 58 lots.

Works Involved

Clearing and Demolitions works, Sediment and Erosion Controls, Bulk Earthworks for 18,000 cubic meters, Stormwater Drainage works, formation of council reserve including roadworks, kerb and gutter, footpaths, etc., Concrete driveways, Water and Sewer Reticulation works, Utilities laying including electricity, gas and NBN, Onsite Stormwater Detention Tank, Landscape works for council.

21 Mason Rd, Box Hill

$5.5 million

This development is a part Stage 1 & 2 of Boddington Gardens which is a multi-dwelling housing development which includes high quality apartments and townhouses; located 150 meters from Box Hill Town Centre.

Works Involved

Demolition, Bulk earthworks and detailed excavation for basement, asbestos removal, construction of new road, sewer, stormwater, electrical, gas and telecommunication services, roadworks, kerb & gutter.

149 Ingleburn Rd, Leppington

$2.4 million

This is a residential subdivision consisting of 46 residential lots, 2 Residual lots as well as council roads.

Works Involved

Bulk earthwork with 25000 cubic metre of import fill, construction of OSD Basin with installation of GPT. 100 m long construction of blockwork retaining wall. Building of pavement layers, demolishing existing turning head, stormwater works and completed concrete works including construction of footpaths across all roads, council pits & structural pits. Carried out service reticulation works such as water, electrical, gas and telecommunication services.

143 Ingleburn Rd, Leppington

$2.3 million

Subdivision work with 18 residential lots and one residual lot.

Works Involved

Bulk earthworks include fill of 6000 cubic meters with VENM material, construction of Onsite detention basin (OSD) including installation of GPT, roadworks include construction of all pavement layers with replacement of poor subgrade. Remediation of contaminated land, bulk earthwork, demolition of existing structures, tree removal, concrete retaining walls, sewer and water reticulation, electrical, gas and telecommunication services.

275 Sixth Ave, Austral

$1.5 million

Subdivision of existing allotment into 16 residential lots.

Works Involved

Construction of roads, kerb & gutter, demolition of existing structures, headwall, removal of trees and site remediation, concrete sleeper retaining walls, utilities (electricity, gas, telecommunication, water and sewer), interallotment drainage, subgrade stabilization using quicklime, existing stormwater pipes investigation and repair by Structural patching; Design and documentation coordination (Superintendent).

285 Sixth Ave, Austral

$2 million

27 residential lots in residential development project.

Works Involved

Road construction, sewer, water, electricity, gas, telecommunication, demolition of existing structures, headwall, removal of trees and site remediation, concrete sleeper retaining walls, interallotment drainage, lime stabilization for subgrade.

54 Fairey Road, South Windsor

$230,000

Project was to extend a new Sewer line coming out from a newly developed commercial building to marry with the existing main sewer.

Works Involved

The depth of the sewer line was at around 6 to 7 meters, to prevent risk of trench collapse metal shoring support method was used.