This development is part of Leppington Garden Estate Stage 2
Works Involved
Bulk Earthworks
36,000 cubic metres bulk earthworks, construction of onsite retention basin with landscaped sandstone retaining wall, massive twin 1350 diameter stormwater drainage system with structure pit up to 4.5m in depth, concrete retaining structures, council road pavement, and all relevant utilities (power, sewer & water, gas, NBN, and telecommunication).