Norwest, NSW
Windsor Road Slip Lane
Arterial road upgrade · 73–75 Windsor Road
- Location
- Norwest, NSW
- Client
- CPD Group Pty Ltd
- Project value
- $700,000
- Project type
- Slip lane and median refuge islands

Scope of works
- New slip lane construction
- New median refuge islands
- Pavement excavation and box-out
- Formation preparation
- Deep-lift asphalt pavement
- Subsoil drainage
- Kerb and gutter construction
- Staged day and night works alongside live traffic
Project overview
CBEM constructed a new slip lane and median refuge islands at 73–75 Windsor Road in Norwest, NSW, for CPD Group Pty Ltd. The $700,000 arterial road upgrade integrated the new slip lane with the existing road.
The pavement works included excavation and box-out, formation preparation, subsoil drainage and deep-lift asphalt pavement. New kerb and gutter formed part of the road construction package.
Construction took place alongside live traffic. Temporary safety barriers, traffic delineation and signage separated road users from the work areas, with operations staged across day and night shifts.
For the wider development, view the 75 Windsor Road subdivision project and Stage 2 civil works. These pages describe the broader development packages; the scope and value shown here relate to the slip lane works.
Explore CBEM’s road construction and pavement services, or contact CBEM to discuss road upgrades and civil works.



More projects
View all projectsLET'S BUILD WHAT'S NEXT





