Land Subdivision in NSW

From DA to Title Resigration, our professional land subdivision team will lead you through all the necessary steps and handle all the required documents to make sure your project achieve success. 

Why Choose Us for Land Subdivision?

Proven approvals and timeframes

  • >95% first-round DA approvals
  • Typical registration for 2-10 lots subdivisions is in 8-16 months, subject to LGA conditions, overlays and authority lead times.
  • Pre-DA feasibility survey will be conducted to scope a basic structure of the potential program process to make cost and time under control.

Credentials and Insurances

  • NSW Builder/Contractor licences with PI/PL insurances in place.
  • Quality, environment and safety management (ISO 9001 / 45001 / 14001), also safety management (AS/NZS 4801) to ensure delivery and compliance
  • Prequalified contractor -R2 (NSW2021-115) for transport, roads and maritime services.

Previous Land Subdivision Projects:

143 Ingleburn Rd, Leppington

Subdivision work with 18 lots and one residual lot.

Bulk earthworks include fill of 6,000 cubic metres with VENM material, construction of Onsite detention basin (OSD) including installation of GPT, roadworks include construction of all pavement layers with replacement of poor subgrade. Remediation of contaminated land, bulk earthworks, demolition of existing structures, tree removal, concrete retaining walls, sewer and water reticulation, electrical, gas and telecommunications services.

275 Sixth Ave, Austral

Subdivision of existing allotment into 16 lots.

Land Subdivision & Construction of Roads

Construction of roads, kerb & gutter, demolition of existing structures, headwall, removal of trees and site remediation, concrete sleeper retaining walls, utilities (electricity, gas, telecommunication, water and sewer), interallotment drainage, subgrade stabilization using quicklime, existing stormwater pipes investigation and repair by Structural patching; Design and documentation coordination (Superintendent).

Land Subdivision FAQ

Hidden challenges include zoning restrictions, unexpected council fees, and delays from utility providers. Potential bushfire or flood risks may require extra reports, and legal access or easement issues can complicate plans. Even after DA approval, further steps are needed before titles can be registered.

In NSW, land subdivision typically takes 6 to 12 months, depending on the site complexity and council processing times. Delays can occur due to planning approvals, service connections, or required reports.

NSW allows several types of land subdivision, including Torrens Title, Strata Title, and Community Title. Torrens is the most common for creating separate lots, while Strata is used for multi-unit developments. Community Title combines shared and private spaces under a management scheme. Achievement of different types depends on your land, zoning, and development goals.