Subdivision civil works in the South West Growth Area
Most sites in Leppington and Austral start as large rural blocks with houses, sheds and trees still on them. A typical scope for us runs from demolition and tree removal through bulk earthworks, roads and kerb, stormwater and OSD, then water, sewer, power, gas and telecommunications reticulation and landscaping.
Recent examples include the $7.5 million package at 1382–1402 Camden Valley Way for a 110-lot development, completed in 2026, and Leppington Gardens for Macland Group, where Stage 1 comprised 93 lots and Stage 2 included around 36,000 m³ of bulk earthworks and twin 1,350 mm stormwater pipes.