Stormwater Drainage & OSD Construction in Sydney & NSW

As a stormwater drainage contractor, CBEM constructs pipe networks and on-site detention (OSD) systems for subdivisions and civil developments in Sydney and regional NSW. Our work includes underground pipelines, pits, detention structures and the connections that discharge water to the approved outlet.

Stormwater Drainage Construction Scope

  • Stormwater pipes, pits and drainage structures
  • On-site detention tanks and basins
  • Outlet controls, headwalls and approved connections
  • Trench bedding, backfilling and compaction
  • Associated concrete and surface reinstatement
  • Inspections, testing and as-built records

Levels and service coordination

We check drainage alignments and levels against the engineering drawings and existing services before installation. The sequence is coordinated with earthworks, utility trenches and road construction, allowing access for excavation, lifting and inspection.

Detention and outlet controls

Detention systems are built to the approved design, including storage levels, outlet controls and overflow arrangements. We coordinate the installation of the specified components and check access for inspection and maintenance before the system is completed.

Checks before backfilling

We check bedding, pipe levels, joints and connections before the work is covered. Required council or asset-owner inspections are arranged at the specified stages. Inspection results, test records and as-built information are compiled for handover.

Stormwater drainage project examples

At Lot 400 Strathyre Drive in Prestons, the works included 210 metres of stormwater pipeline and eight drainage pits, followed by public area reinstatement.

Leppington Gardens Stage 2 included twin 1,350 mm pipes and pits up to 4.5 metres deep. At the start of site works, CBEM also identified a clash between the sewer infrastructure and stormwater drainage designs. Raising the issue promptly with the project manager enabled the drawings to be revised before the affected construction began, helping avoid delays from a later design change.